The G21 project was a largescale project that enfolded at Toyota
in the 1990’s. The aim was to navigate Toyota through the advent of the 21st
century, by creating a vehicle (catalogue) that could withstand the challenges
of the upcoming 21st century, including ever growing resource
scarcity.
Many of you have seen one of the most prominent fruits of
this project on the road. Perhaps, you or someone you know, even drives it. We
are of course referring to the Toyota Prius. Less well known is another “fruit”
of the G21 project, namely the “obeya” (大部屋) which translates to “big room”
and was the brain child of Takeshi Uchiyamada, the chief engineer of the G21 project.
As the project advanced, Uchiyamada started to experience
the same frustrating situation over and over again. Toyota was not a small
company. In fact it was an industrial behemoth. A vast variety of experts,
leaders and stakeholders wandered around in that gigantic ecosystem, both in
and outside the Aichi prefecture in Japan.
The G21 project could not be contained to one or just a
handful of parts, in this gigantic ecosystem. It needed to blanket the whole
organization. But how could Uchiyamada do that, with all these conflicting
preferences and ideas? How could he do it with all these data islands that were
no connected? This frustrating efforts to bring the project to the
organization was replaced by a new tactic. Takeshi Uchiyamada would bring
the organization to the project! He drew inspiration from already existing
concepts and created a physical room that would host stakeholders, experts and
decision makers on a regular basis. They would be surrounded by all the
relevant data.
The idea was that this setup would maximize effective and
efficient communication. Data would not stay on little islands, ideas would not
have to be voiced over and over again, but rather once! These days, many
organizations, including Nike, have copied this practice of the obeya.
Setup
Contrary to what some believe, there exists no universal way
to actually set the obeya up. Here are a variety of setups that we have seen in
practice. Lean practitioners should feel free to deviate from these setups if
they believe that it benefits the cause.
Setup A:
Wall 1: Performance metrics
Wall 2: Ideas: Concepts, design sketches etc.
Wall 3: Progress data: Kanban boards, Gantt charts etc.
Wall 4: Feedback: Internal feedback from colleagues and external feedback from the field.
Setup B:
Wall 1: Customer information: VOC, personas, feedback etc.
Wall 2: Product (or service) information: Concepts, sketches etc.
Wall 3: Process information: Value stream map, process map etc.
Wall 4: Performance information: KPIs.